Day 130 - Sliding doors, pool house and roof parapet

The large 3.25m x 2.6m sliding doors in the lounge are in

View of the pool house taken from the flat roof

The flat roof ready for the insulation and membrane 

Thursday, 27 October 2011

Tuesday, 25 October 2011

Day 126 - The windows have arrived!

The busiest day on site yet!

The crane has arrived, taking up the entire driveway!

The width of our sliding doors are taller than Cliff.

Crane to lift the doors over the house

The 4m wide door for the Master hanging over the house

Not much room in between the scaffolding




10 minutes later...

And it's in!

Monday, 24 October 2011

Day 125 - Finishing off the flat roof

Roof joists over the master bedroom

Joists and roof boarding over the hall / landing


Flat roof covering going on

Wednesday, 19 October 2011

Day 120 - First floor internal walls complete

From Bed1 looking across the landing bridge to Bed2

Stairwell and Family bathroom from the landing bridge 

Master looking towards the En-suite and Dressing room

Tuesday, 18 October 2011

Day 119 - First floor walls near completion

From the front...

Get a real sense of the height of the pitch roof in Bed 3

From Bed 1 to the hall void, stairwell and master bedroom

And from the back...

Friday, 14 October 2011

Day 115 - First floor joists and floor complete

First floor covered (apart from the hole for the staircase!)

 

Large steel spanning the living room.

The bridge for the first floor landing

Wednesday, 12 October 2011

Day 113 - Floor joists and first floor going on


Floor covering over the kitchen / dining room.

I-beam joists and floor over the kitchen / dining room.

Saturday, 8 October 2011

Day 109 - Ground floor walls complete

In the lounge looking towards the rear patio doors

The open plan kitchen area from the front.

Looking into the office from the lounge.

Looking across the lounge to the kitchen from the office.

Front of the house - kitchen on the left, garage on the right.

Thursday, 6 October 2011

Day 107 - Good progress, ground floor walls almost complete

Jaclyn standing in front of the patio door openings in the lounge

From the rear corner looking to the front of the kitchen

Slab for the pool house now ready
House from the rear showing the three large patio doors

The jigsaw puzzle of numbered panels sitting next door

Tuesday, 4 October 2011

Saturday, 1 October 2011

Day 101 - Basement ready

Friday 30th Sept.  We missed the deadline for the timber frame and had to push it back a week.  Finishing off the basement walls has taken longer than expected and the load bearing walls needed longer to cure than anticipated before supporting the concrete floor planks.  In the meantime finishing off the perimeter walls fronting the sheet piling. Steels in place spanning the TV room, around the openings for the walk on glass floor sections and the stair opening.


Concrete planks arrive Monday.