Modern House Build In Surrey
Sunday, 27 November 2011
Day 156 - Progress inside as well
First fix plumbing well underway
and first fix electrics almost done.
Day 155 - Laying the outer roof membrane
The Evalon V membrane being glued down
and seams hot welded.
The flat roof complete.
Day 154 - Insulating the roof
Around 250mm of insulation going on the flat roof.
Monday, 14 November 2011
Day 144 - Windows complete
Large window in the hallway void hoisted in to position
Pool house doors and window in
Sunday, 13 November 2011
Day 143 - Zinc roof and getting ready for first fix
Zinc covering to pitched roof complete
Flat roof ready for the tapered insulation to be fitted
Inside all battened out ready for the services
Cara-Lee trying out the staircase
Thursday, 3 November 2011
Day 134 - Roofing and stairs
First layer of membrane for the flat roof, watertight at last
Zinc roof sheets for the pitched roof being rolled out
Staircase from ground floor to first