Saturday, 21 April 2012

Day 297 - On the home straight

Grading of the driveway and drainage channels

What drought?  A lot of mess this week in the thick clay.

Second fix plumbing almost done in all bathrooms.

Carpentry nearing completion too. A lot of painting needed!

Basement utility room fitted out.

Basement shower room


Plant room - Central Vac, MHRV, ASHP and hot water tank

Sunday, 1 April 2012

Day 277 - Zinc capping, garage door and glass balustrades fitted

Busy week on site.  On the exterior the glass balustrades to both balconies has been finished in the frameless 15mm toughened glass  On the roof the skylight above the landing has been fitted and the zinc roofers have been back to do the roof capping, flashings and rainwater goods.  Out front the garage door has arrived and been installed.  Inside the house the central vacuum and MHRV systems have been second fixed, the utility room units have arrived and the install started.  We have running water and working lights!