Monday 5 December 2011

Day 163 - First floor first fix nearing completion

Wiring, plumbing and underfloor heating completed

MHRV ducting this week and then on to wall linings next

Monday 14 November 2011

Day 144 - Windows complete

   

Large window in the hallway void hoisted in to position

Pool house doors and window in

Sunday 13 November 2011

Day 143 - Zinc roof and getting ready for first fix

Zinc covering to pitched roof complete

Flat roof ready for the tapered insulation to be fitted

Inside all battened out ready for the services

Cara-Lee trying out the staircase

Thursday 3 November 2011

Day 134 - Roofing and stairs

First layer of membrane for the flat roof, watertight at last

 Zinc roof sheets for the pitched roof being rolled out

Staircase from ground floor to first

Sunday 30 October 2011

Day 130 - Sliding doors, pool house and roof parapet

The large 3.25m x 2.6m sliding doors in the lounge are in

View of the pool house taken from the flat roof

The flat roof ready for the insulation and membrane 

Thursday 27 October 2011

Tuesday 25 October 2011

Day 126 - The windows have arrived!

The busiest day on site yet!

The crane has arrived, taking up the entire driveway!

The width of our sliding doors are taller than Cliff.

Crane to lift the doors over the house

The 4m wide door for the Master hanging over the house

Not much room in between the scaffolding




10 minutes later...

And it's in!

Monday 24 October 2011

Day 125 - Finishing off the flat roof

Roof joists over the master bedroom

Joists and roof boarding over the hall / landing


Flat roof covering going on

Wednesday 19 October 2011

Day 120 - First floor internal walls complete

From Bed1 looking across the landing bridge to Bed2

Stairwell and Family bathroom from the landing bridge 

Master looking towards the En-suite and Dressing room

Tuesday 18 October 2011

Day 119 - First floor walls near completion

From the front...

Get a real sense of the height of the pitch roof in Bed 3

From Bed 1 to the hall void, stairwell and master bedroom

And from the back...

Friday 14 October 2011

Day 115 - First floor joists and floor complete

First floor covered (apart from the hole for the staircase!)

 

Large steel spanning the living room.

The bridge for the first floor landing

Wednesday 12 October 2011

Day 113 - Floor joists and first floor going on


Floor covering over the kitchen / dining room.

I-beam joists and floor over the kitchen / dining room.