| The large 3.25m x 2.6m sliding doors in the lounge are in |
| View of the pool house taken from the flat roof |
| The flat roof ready for the insulation and membrane |
| The busiest day on site yet! |
| The crane has arrived, taking up the entire driveway! |
| The width of our sliding doors are taller than Cliff. |
Crane to lift the doors over the house |
| The 4m wide door for the Master hanging over the house |
| Not much room in between the scaffolding |
| 10 minutes later... |
| And it's in! |
