Thursday 22 September 2011

Day 88 - Basement progress and drainage

Surface water drainage being laid and connected to the rainwater harvesting tank.







Waterproofing membrane added to the basement floor.  Next step is the steel reinforcement bars. The bottom has been shaped to allow for slab thickening under the load bearing walls and for the drainage.