Friday, 14 October 2011

Day 115 - First floor joists and floor complete

First floor covered (apart from the hole for the staircase!)

 

Large steel spanning the living room.

The bridge for the first floor landing

Wednesday, 12 October 2011

Day 113 - Floor joists and first floor going on


Floor covering over the kitchen / dining room.

I-beam joists and floor over the kitchen / dining room.

Saturday, 8 October 2011

Day 109 - Ground floor walls complete

In the lounge looking towards the rear patio doors

The open plan kitchen area from the front.

Looking into the office from the lounge.

Looking across the lounge to the kitchen from the office.

Front of the house - kitchen on the left, garage on the right.

Thursday, 6 October 2011

Day 107 - Good progress, ground floor walls almost complete

Jaclyn standing in front of the patio door openings in the lounge

From the rear corner looking to the front of the kitchen

Slab for the pool house now ready
House from the rear showing the three large patio doors

The jigsaw puzzle of numbered panels sitting next door

Tuesday, 4 October 2011

Saturday, 1 October 2011

Day 101 - Basement ready

Friday 30th Sept.  We missed the deadline for the timber frame and had to push it back a week.  Finishing off the basement walls has taken longer than expected and the load bearing walls needed longer to cure than anticipated before supporting the concrete floor planks.  In the meantime finishing off the perimeter walls fronting the sheet piling. Steels in place spanning the TV room, around the openings for the walk on glass floor sections and the stair opening.


Concrete planks arrive Monday.





Saturday, 10 September 2011

Day 80 - Sheet piling contractors are done

After a few lost days due to the bad weather the sheet piling contractors have finished welding the puddle flange and sheer studs to the sheet piles. Next step is the basement slab.